TM.E. has signed with Bionerga the contract for the design and construction of the waste-to-energy plant in Beringen, Belgium.
TM.E. has signed with Bionerga the contract for the design and construction of the waste-to-energy plant in Beringen, Belgium.
The plant consists of a single line with the capacity of approx. 200,000 tons / year of RDF. The installation will produce electricity with an installed power of 15 MWe and is equipped with a dry flue gas treatment with SCR.